⭐ NEW ⭐ LILAC Far UV Now Available

Installation and Maintenance


Installation and Maintenance

UVCAN will schedule the delivery and installation of equipment at client's convenience. All installation is in accordance with the manufacturer's instruction, and building codes. The necessary coordination with the landlord and strata permissions will be advised or performed in advance by the technical team.

We provide periodic maintenance every six months or as needed. Our equipment is calibrated by our technicians and engineers and we provide you with proof of performance. This proof of performance is based on the assumption that there will be no alterations of the site, including rearrangement of furniture or major elements that will affect the disinfection area.

Close (esc)

Popup

Use this popup to embed a mailing list sign up form. Alternatively use it as a simple call to action with a link to a product or a page.

Age verification

By clicking enter you are verifying that you are old enough to consume alcohol.

Search

Shopping Cart

Your cart is currently empty.
Shop now